SevenoaksPD

Rear extension in Sevenoaks (Permitted Development)

Rear extension. PD route. 14 weeks.

Rear extension in Sevenoaks (Permitted Development) before
Rear extension in Sevenoaks (Permitted Development) after
Before
After
Property type
Terraced
Project type
Rear extension
Planning route
PD
Timeline
14 weeks
Size
28 m²
Budget band
£60k–£100k

The brief

The client wanted a brighter kitchen-diner with a utility zone and a clean PD route to avoid planning delay.

What made it tricky

  • Party wall coordination on both sides
  • A drainage run within the build zone
  • Tight rear access for materials

Planning route

We kept the rear projection within safe PD thresholds and documented key measurements to reduce risk.

Design + build approach

We used a low-profile roof, detailed the drainage diversion early, and phased access to keep the street clear.

Want the same route?
  • Clear PD vs planning route
  • Risks flagged early
  • Survey → drawings → approvals → build
Planning route: PD

We kept the proposal within PD limits and documented compliance to reduce risk.

Timeline
Survey + brief1w
Drawings + revisions2w
Approvals / route confirmation2w
Pre-start + procurement1w
Build phase8w
Handover1w

Before / after gallery

Rear extension in Sevenoaks (Permitted Development) gallery 1
Rear extension in Sevenoaks (Permitted Development) gallery 2
Rear extension in Sevenoaks (Permitted Development) gallery 3
Rear extension in Sevenoaks (Permitted Development) gallery 4
Client feedback

They mapped the PD route clearly and kept everything on track.

Hannah, Sevenoaks

What this means for your home

If your terrace has similar access constraints, a conservative PD‑compliant depth and early drainage checks can keep the route simple.

FAQs for rear extensions under PD

Do rear extensions need planning permission?
Often no, if depth and height limits are respected and there are no restrictions removing PD rights.

Is a party wall agreement required?
If you share walls or excavate near a neighbour, the Party Wall Act usually applies.

When should I apply for an LDC?
If you want certainty for resale, an LDC is a good option even when PD is likely.

Want the same route?
  • Clear PD vs planning route
  • Risks flagged early
  • Survey → drawings → approvals → build
This result is based on your property details. For certainty, we recommend a quick consult and (where appropriate) an LDC.